Category Archives: uncategorized

Lighting and power supply upgrades in the Library

The lighting on Level 3 of the Library is being upgraded over Summer. Smart LED lighting is being installed across the floor, including staff offices. This will improve both the environment and provide energy savings. The floor is accessible as … Continue reading

Posted in uncategorized | Leave a comment

Library electrical shutdown: Sat 2 Sept

Essential electrical substation maintenance taking place on Saturday 2 Sept 2017 will necessitate electrical shut downs in various campus buildings. Electricity and therefore lighting, PCs and all electrical devices in the Library will be switched off from 6 am to … Continue reading

Posted in uncategorized | Leave a comment

Are you printing in the Library? Please read this message

The University is transferring to a new print service. The new service (using printers supplied by Sharp) is now operational in the Library and three Departments: Academic Skills Centre, Architecture and Civil Engineering and Chemistry. The service used by all … Continue reading

Posted in uncategorized | Leave a comment

New University Print Service

The University is in the process of changing its printing equipment supplier from Canon to Sharp.  Brand new printers will be available in the Library for students from Tuesday 13th June. Do take a look at the University Print Service … Continue reading

Posted in uncategorized | Leave a comment

Silent & quiet study during revision and exams

Please be considerate to your fellow students during the revision period by keeping noise to a minimum on the quiet floors (Levels 3 and 4) and maintaining silence on Level 5. Quiet and silent study space is very popular at this time … Continue reading

Posted in uncategorized | Leave a comment

Library heating switches off to allow vital repair work: afternoon of 4 – 5 May

Due to essential repairs to a leak on the high temperature hot water pipework system the heating to all levels of the Library will be switched off later this afternoon.  This will allow the pipework to cool down sufficiently so … Continue reading

Posted in uncategorized | Leave a comment

Graffiti board comments – April 2017

After a brief hiatus whilst we focused on collecting your views via our LibQual survey, we are re-opening graffiti board comments. We are currently analysing over 1,500 survey responses and will provide feedback in due course. Thanks again to all … Continue reading

Posted in uncategorized | Leave a comment